Our Location

Private Label

Candle Making Supplies

Wax, dyes and fragrance oils for candle making - raw materials under REACH and CLP, not a cosmetic under Article 2 of Regulation 1223/2009.

All product types
  • REACH / CLP

In brief

Fragrance oils, dyes and wax supplied as candle-making raw materials are not cosmetic products under Article 2 of Regulation (EC) No 1223/2009, since they are not intended to be placed in contact with the human body - their supply falls under chemicals legislation (CLP Regulation (EC) No 1272/2008 and REACH) and general product-safety rules instead. AKTO develops and supplies these components to order from its raw-material stock and compounding lines.

Candle Making Supplies

01

Candle making supplies as a product type

Candle-making supplies - wax, wicks, fragrance oils and dyes - are raw materials for B2B customers who make their own finished candles, not a finished product applied to the body. Fragrance oils, dyes and wax supplied this way are not cosmetic products under Article 2 of Regulation (EC) No 1223/2009, because they are not intended to be placed in contact with the human body - their supply falls under chemicals legislation (CLP Regulation (EC) No 1272/2008 and REACH) and general product-safety rules instead. AKTO develops and supplies these components to order, matched to the client's wax type, colour and fragrance-load specification.

02

Raw-material and labelling requirements

Under REACH Annex XVII, substances classified as carcinogenic, mutagenic or toxic for reproduction (Category 1A/1B) may not be supplied to the general public above specified concentration limits, and packaging of any remaining permitted supply must be marked "Restricted to professional users" - a restriction that bears more directly on concentrated raw fragrance oils sold as candle-making supplies than on a finished, diluted candle. Regulation (EC) No 1272/2008 (CLP) requires suppliers of hazardous mixtures such as fragrance oils and dyes to classify and label the mixture and, where required by REACH Article 31, to provide a safety data sheet - obligations that attach at the point raw candle-making materials are supplied.

  • General-public restriction of CMR substances (carcinogenic, mutagenic or toxic for reproduction) under REACH Annex XVII
  • Classification, labelling and safety data sheet under CLP and REACH Article 31
  • Supplier obligations attach at the point raw materials are supplied

03

Regulatory framework: consumer safety and registration

Regulation (EU) 2023/988 (General Product Safety Regulation) requires producers to place only safe products on the market - a general safety-net regime covering consumer candle-making kits absent sector-specific EU legislation. AKTO is registered under KVED code 20.59 - manufacture of other chemical products not elsewhere classified - applicable to the supply of wax, dye and fragrance-oil raw materials for candle making.

04

What AKTO offers

Under AKTO's standard production contract, client-supplied raw materials or packaging must be delivered no later than 5 working days before the production cycle, DDP (Incoterms: Delivered Duty Paid) to AKTO's warehouse; quality acceptance takes up to 5 working days, and production readiness is confirmed within 2 working days. AKTO requires a buffer of 2-3% above the planned quantity for client-supplied labels, bottles or dispensers, to cover in-process losses.

  • Formats: raw wax / dye / fragrance-oil components
  • Packaging: jars, dropper bottles
  • Client raw materials due 5 working days before the cycle, DDP to AKTO's warehouse
  • 2-3% buffer for in-process losses on client-supplied materials
  • Two plants: Kyiv, Ukraine, and Warsaw, Poland
  • ISO 9001 + ISO 22000 (HACCP; certificate No. 44600111204)

05

Getting started on a candle-supplies order

The brand sets the component list - wax, dye, fragrance oil - volumes and the delivery schedule, and AKTO checks safety data sheets and CLP labelling before the batch is accepted.

  1. Brief: component list, volumes, delivery schedule
  2. Safety data sheet and CLP labelling check
  3. Raw-material quality acceptance - up to 5 working days
  4. Production-readiness confirmation - up to 2 working days

See also: Candles & Wax Melts, Air Care, Fragrance and Cosmetics & Personal Care.

Frequently Asked Questions

Is candle fragrance oil a cosmetic product?
No - since it is not intended to be placed in contact with the human body, its supply falls under chemicals legislation (CLP and REACH) and general product-safety rules instead.
What documents are needed to supply candle fragrance oil?
The supplier must provide a safety data sheet under REACH Article 31 and label the mixture under Regulation (EC) No 1272/2008 (CLP).
When must the client deliver their own raw materials?
No later than 5 working days before the production cycle, DDP to AKTO's warehouse; quality acceptance takes up to 5 working days.
Is extra material needed beyond the planned quantity?
Yes - AKTO requires a 2-3% buffer above the planned quantity for client-supplied labels, bottles or dispensers, to cover in-process losses.

Expert review

Reviewed by

  • Illia Mariutsa Illia Mariutsa

    Researcher, organic chemistry

    Google Scholar
  • Anastasiia Bespalova Anastasiia Bespalova

    Paediatric orthopaedic and trauma surgeon

    ORCID

Why AKTO

  • Safety data sheet and CLP labelling for every raw-material batch
  • Client materials due 5 working days before the cycle, DDP to AKTO's warehouse
  • Production readiness confirmed within 2 working days
  • 2-3% buffer for in-process losses on client-supplied materials
  • Two plants: Kyiv, Ukraine, and Warsaw, Poland